Preliminary evaluation of truck-by-truck ore sorting at Olimpiadinskoye: X-ray radiometric analysis, ore-flow selection and a forecast of up to 2.936 tonnes of additional gold in processed ore per year.

Feasibility forecast · 2026

Using publicly available information and comparable technologies at Sukhoi Log and Natalka, Integra Ru specialists assessed the potential for bulk (truck-by-truck) sorting of gold-sulfide ore at Olimpiadinskoye. Rapid X-ray radiometric sampling (XRS) at an ore control station (RCS) makes it possible to redirect ore streams according to grade and potentially increase gold output. A preliminary calculation indicates up to 2.936 tonnes of additional gold in the ore delivered to processing each year. Under an assumed 40–50% margin, capital expenditure on the RCS could be recovered in less than 10 days.

2.936 tonnesadditional gold in ore sent for processing per year — forecast

Technology and assumptions

  • Technology: X-ray radiometric sampling (XRS) of haul trucks at an ore control station (RCS). Each truck can be sampled in no more than one minute, with a stated throughput of at least 15 trucks per hour.
  • Baseline parameters: Annual ore extraction of 10.4 million tonnes, average Au grade of 2.1 g/t, and current dilution of up to 19–27%.
  • Ore stream selection: The forecast assumes that at least 15% of trucks carry diluting material or low-grade ore with a gold grade below 0.5 g/t.
  • How the flow is redirected: The low-grade fraction is diverted from the processing plant and replaced with suitable-grade ore that has passed XRS, increasing the average feed grade without changing the tonnes processed.

Preliminary calculation

  • Additional gold in plant feed: 2.936 tonnes per year (94,409.7 troy ounces).
  • Indicative revenue: Approximately USD 411 million for this amount, based on the London gold quotations assumed in the original estimate.
  • Illustrative payback: With a 40–50% margin on additional revenue, the model indicates that RCS capital expenditure could be recouped in less than 10 days.

Baseline and forecast calculations

Figures transcribed from the calculation supplied by Integra Ru

ParameterValueUnit
Annual ore extraction10,400,000tonnes
Average Au grade2.1g/t
Gold contained in extracted ore21.84tonnes
Low-grade/dilution fraction selected15%
Selected low-grade mass1,560,000tonnes
Au grade in selected mass0.5g/t
Gold in selected mass0.780tonnes
Gold excluding selected mass21.060tonnes
Average Au grade after selection2.38g/t
Gold in replacement plant feed24.776tonnes
Additional gold in feed annually2.936tonnes

Technical basis

  • Comparable research: The forecast draws on R&D findings for X-ray radiometric enrichment of ores of similar origin at Sukhoi Log, Natalka and other deposits, where comparable technical performance has been established.