Suzdal: truck-by-truck sorting forecast — 250 kg of additional gold per year

RCS feasibility forecast for Suzdal: 315,000 tonnes of ore per year, 13% projected improvement and 250 kg of additional gold per year under the stated assumptions.

Feasibility forecast · 2026

Integra Ru specialists assessed the potential benefits of bulk (truck-by-truck) ore sorting at the Suzdal deposit. Their preliminary assessment suggests that an ore control station (RCS) could increase annual gold recovery by 13% at the assumed mining parameters.

250 kgforecast additional gold recovered per year

Project assumptions

  • Annual ore extraction: 315,000 tonnes.
  • Initial gold grade: 6.0 g/t.
  • Current dilution: 15–25%; a value of 15% is used in the calculation.
  • RCS throughput: At least 15 haul trucks per hour; sampling takes less than one minute per truck.

Forecast results

  • Initial annual gold recovery: 1.89 tonnes.
  • Forecast after sorting: 2.14 tonnes per year.
  • Additional gold output: 250 kg (8,037.66 troy ounces).
  • Projected recovery growth: 13%.
  • Indicative revenue: Approximately USD 37 million, based on the original forecast assumptions.

Indicative economics

  • Gross margin: 30–40% of the additional revenue.
  • Estimated payback: 1–2 months under the stated assumptions.
  • Sorting approach: Selection of 15% of trucks carrying diluting material with a grade below 1.5 g/t.

Technology

  • Haulage: Trucks with payload capacities of 20–30 tonnes.
  • Method: X-ray radiometric sampling (XRS).
  • Operating principle: The average gold grade of each truckload is determined, and the ore is directed according to the mine's operating plan.