INTEGRA
Suzdal: truck-by-truck sorting forecast — 250 kg of additional gold per year
RCS feasibility forecast for Suzdal: 315,000 tonnes of ore per year, 13% projected improvement and 250 kg of additional gold per year under the stated assumptions.
Feasibility forecast · 2026
Integra Ru specialists assessed the potential benefits of bulk (truck-by-truck) ore sorting at the Suzdal deposit. Their preliminary assessment suggests that an ore control station (RCS) could increase annual gold recovery by 13% at the assumed mining parameters.
250 kgforecast additional gold recovered per year
Project assumptions
- Annual ore extraction: 315,000 tonnes.
- Initial gold grade: 6.0 g/t.
- Current dilution: 15–25%; a value of 15% is used in the calculation.
- RCS throughput: At least 15 haul trucks per hour; sampling takes less than one minute per truck.
Forecast results
- Initial annual gold recovery: 1.89 tonnes.
- Forecast after sorting: 2.14 tonnes per year.
- Additional gold output: 250 kg (8,037.66 troy ounces).
- Projected recovery growth: 13%.
- Indicative revenue: Approximately USD 37 million, based on the original forecast assumptions.
Indicative economics
- Gross margin: 30–40% of the additional revenue.
- Estimated payback: 1–2 months under the stated assumptions.
- Sorting approach: Selection of 15% of trucks carrying diluting material with a grade below 1.5 g/t.
Technology
- Haulage: Trucks with payload capacities of 20–30 tonnes.
- Method: X-ray radiometric sampling (XRS).
- Operating principle: The average gold grade of each truckload is determined, and the ore is directed according to the mine's operating plan.