INTEGRA
Zhayrem: R&D on X-ray radiometric sorting of lead-zinc ore completed
Completed R&D at Zhayrem: 400 ore samples, testing of 100 haul trucks, correlation coefficients and X-ray radiometric sorting results for Pb and Zn.
Research and development · 2024–2025
Integra Ru completed an R&D study into preliminary truck-by-truck sorting of subeconomic lead-zinc ore from the Zhayrem deposit.
400 samplesore samples processed and analysed in the R&D project
Key research findings
- Scope: 400 ore samples were processed and analysed.
- Scientific finding: An effective ore classification criterion was established.
- Correlation: The reported correlation coefficients for lead and zinc against the classification criterion ranged from 0.94 to 0.98.
- Field testing: X-ray radiometric sampling (XRS) was performed on 100 trucks with payload capacities of 90–140 tonnes, carrying subeconomic ore.
Technical performance
- Measurement accuracy: Average relative deviation between XRS and chemical analysis: 20.8% for Pb and 25.0% for Zn.
- Ore selection efficiency: The reported ratio of recovery estimated by XRS to chemical-analysis results was 99.5% for Pb, 98% for Zn and 98.3% for equivalent Zn.
- Equipment: Integra's mini ore control station (mini RCS) was used.
Practical implications
- Low-grade ore: The tests confirmed the potential for effective handling of subeconomic ore.
- Sorting: The applicability of bulk (truck-by-truck) sorting was demonstrated.
- Scale-up: Technical parameters for potential scale-up were established.
