INTEGRA

Zhayrem: R&D on X-ray radiometric sorting of lead-zinc ore completed

Completed R&D at Zhayrem: 400 ore samples, testing of 100 haul trucks, correlation coefficients and X-ray radiometric sorting results for Pb and Zn.

Research and development · 2024–2025

Integra Ru completed an R&D study into preliminary truck-by-truck sorting of subeconomic lead-zinc ore from the Zhayrem deposit.

400 samplesore samples processed and analysed in the R&D project

Key research findings

  • Scope: 400 ore samples were processed and analysed.
  • Scientific finding: An effective ore classification criterion was established.
  • Correlation: The reported correlation coefficients for lead and zinc against the classification criterion ranged from 0.94 to 0.98.
  • Field testing: X-ray radiometric sampling (XRS) was performed on 100 trucks with payload capacities of 90–140 tonnes, carrying subeconomic ore.

Technical performance

  • Measurement accuracy: Average relative deviation between XRS and chemical analysis: 20.8% for Pb and 25.0% for Zn.
  • Ore selection efficiency: The reported ratio of recovery estimated by XRS to chemical-analysis results was 99.5% for Pb, 98% for Zn and 98.3% for equivalent Zn.
  • Equipment: Integra's mini ore control station (mini RCS) was used.

Practical implications

  • Low-grade ore: The tests confirmed the potential for effective handling of subeconomic ore.
  • Sorting: The applicability of bulk (truck-by-truck) sorting was demonstrated.
  • Scale-up: Technical parameters for potential scale-up were established.